首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Using the score method to construct asymmetric confidence intervals: An SAS program for content validation in scale development
Authors:Email author" target="_blank">Jeffrey?M?MillerEmail author  Randall?D?Penfield
Institution:College of Education, University of Florida, Gainesville, Florida 32622-7047, USA. millerjm@ufl.edu
Abstract:Expert review sessions are often conducted to determine the content validity of scale items. The accurate quantification of content validity is usually limited by a relatively small number of experts as well as by a small number of rating categories. These factors, combined with the bounded and discrete nature of rating scale categories, hinder use of traditional methods for computing standard errors and confidence intervals. Using an application of the score method, researchers can construct an asymmetric interval that is better suited for these situations. SAS code is provided to automate the computations, and a discussion of two methods for using the obtained results for content validation decisionmaking follows.
Keywords:
本文献已被 PubMed SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号