首页 | 本学科首页   官方微博 | 高级检索  
     


Multiple schedule component duration: a reanalysis of Shimp and Wheatley (1971) and Todorov (1972)
Authors:Edmon E L
Abstract:The tendency for relative response rate to approach matching as multiple schedule component duration decreases has been interpreted as confirming a prediction of Herrnstein's multiple schedule equation. However, the equation predicts that absolute response rate will decrease in both multiple schedule components as component duration decreases. The absolute response-rate data of two studies of component duration do not support this prediction; absolute rate either increased or remained relatively constant.
Keywords:multiple schedules  component duration  matching law  key peck  pigeons
本文献已被 PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号